A wet timber bridge at night under fog, with a single strain-gauge post glowing faint instrument light and an empty two-lane deck shining with rain. Cover art for Load Post Fourteen on dailycreepypasta.com.

Load Post Fourteen

4 min read

GRAYS HARBOR COUNTY PUBLIC WORKS

Bridge Inspection Field Note — B-214 (Wishkah Spur Timber Trestle)

Date: 10/28
Inspector: Perrin, M.
Posted load: 12 tons
Weather: rain, 48°F
Summary: Annual before winter. Deck planks worn but within tolerance. Railings intact. Strain gauge network online (posts 1–16).

Exception: Load Post 14 overnight delta (00:00–05:00) averaged +410 lb across the last 7 nights with no permitted load and no recorded axle events on the approach loops. Threshold for stop-and-hold is +200 lb sustained.

Action: Request night crew confirm gauge seating and check for debris / animal load on Post 14 bay. Do not close span yet; school bus route uses spur at 07:10.


WORK ORDER 26-4419

Issued: 10/28 14:12
Crew lead: Joss R.
Task: B-214 / Load Post 14 — reseat gauge, clear bay, photograph, radio clear.

Crew notes (radio log excerpt):

Time Unit Text
01:12 PW-7 On site. Deck empty. Approach loops quiet.
01:18 PW-7 Post 14 bay clear. No debris. Gauge housing dry inside.
01:21 PW-7 Reading live +0. Going to tap housing.
01:22 PW-7 Tap done. Still +0.
01:29 PW-7 Stand by — hearing footsteps on deck, south to north. Loops still quiet.
01:30 PW-7 Visual clear. Fog. No vehicle. No person.
01:31 DISP Advise if you need second unit.
01:33 PW-7 Negative. Probably expansion noise. Reseating complete. Leaving cams on.

Photo packet: 6 images. Deck empty in all. Post 14 indicator LED green. One image (01:29:44) shows a darker smear on wet plank at midspan; crew marked “fog / motion blur.”


EMAIL — Metering / Structures

From: Odette K., Admin
To: Perrin M.
Date: 10/29 08:04
Subject: B-214 overnight deltas (auto)

Perrin — spreadsheet attached. Post 14 is the only outlier. Nights of 10/22–10/28:

  • median overnight delta posts 1–13, 15–16: +18 lb
  • Post 14: +390, +405, +410, +440, +455, +470, +510 lb

No correlating weather spike. No construction permits on spur. School district asked if frost heave could add weight. I told them frost does not climb a post in six-hour steps.

Please either sign continue-in-service or start the closure packet before the 11/05 bus schedule lock.


INCIDENT SUPPLEMENT — Night Flagging

Date: 10/30
Author: Joss R.
Narrative: Returned alone at 02:05 to swap the camera card. Deck empty. Post 14 display read +610 lb as I stepped onto the south abutment. As I walked toward midspan the number fell in roughly 160-lb increments, as if something were stepping off bay by bay ahead of me. At Post 14 the display read +0. My own weight did not register until I put a hand on the housing. Then it jumped to +178 lb and held. I am 176. I left. I did not radio it in clean. I am writing it here so it exists somewhere that is not my truck.


INSPECTION DECISION FORM — B-214

Date: 10/31
Inspector: Perrin, M.
Finding: Gauge anomaly under review; no visible structural distress.
Decision: Continue in service pending vendor calibration visit (scheduled 11/12).
Justification: Closure would force a 19-mile detour for school route and logging traffic. Risk accepted by Structures pending calibration.

Signed: M. Perrin
Time: 16:40


AUTO-ALERT (strain network)

Date: 11/03 02:11
Asset: B-214 / Load Post 14
Message: Sustained delta +1,920 lb for 11 minutes. Approach loops: 0. Camera motion: yes (frame attached).
Frame note (system): single upright heat signature at Post 14, no corresponding loop trigger. Signature weight estimate from gauge: ~1,900 lb.

Operator ack: none (after hours)


SCHOOL DISTRICT TRANSPORTATION — Route note

From: Dispatch (Wishkah Elementary)
To: County Public Works (shared inbox)
Date: 11/01 06:22
Subject: B-214 frost / weight complaint

Bus 6 drivers report the spur “feels soft” at midspan on cold mornings. No visible sag. One driver (am route) said the deck “took a step” under the rear axle at approximately the painted 14 marker. We are not engineers. We are asking whether the continue-in-service decision still holds for a loaded Type C bus (~24,000 lb GVWR). Parents are already nervous about the detour rumor.

Please reply before 11/05 schedule lock.


VENDOR PRELIM (phone note, typed by Odette)

Date: 11/02 15:40
Vendor: Cascade Strain Systems
Said: Housing torque OK. Cable integrity OK. “If you are seeing stepped unload under a walking approach, that is not a gauge fairy tale, that is mass leaving the span.” Asked whether livestock use the trestle. Answered no. Asked whether anyone stands on Post 14 for photos. Answered we hope not. Calibration visit held at 11/12 unless emergency closure.


CAMERA CARD EXTRACT — PW-7

Pulled: 11/03 06:50 by Joss R.
Clip of interest: 11/03 02:10:58–02:12:09

Deck appears empty at start. At 02:11:03 a vertical heat shape occupies the Post 14 bay. No headlamp. No phone light. Approach loops remain zero for the entire clip. At 02:11:40 the shape is gone and Post 14 LED is still green. Audio track: rain, one creak consistent with plank flex, no voices. Joss initialed the evidence bag and put it in the Structures locker. Perrin has the key.

MEMO — Structures to Admin (final)

From: Perrin, M.
To: Odette K.
Date: 11/04 07:02
Subject: Re: B-214 / Post 14 naming on roster

Odette — vendor called. They say the gauge is calibrated. They say the overnight load is real.

Please update the public closure map draft to list the reason code as LOAD POST 14 OCCUPIED for internal use only. Do not put that language on the public page.

Also: the auto-alert frame from 02:11 resolved the signature against the employee badge database. It matched no current employee.

It matched a retired inspector name we still keep in the training archive for signature examples.

It matched mine.

I did not go to the bridge at 02:11. My badge is on my kitchen table. The continue-in-service form is already filed.

If the school bus is to cross at 07:10, someone else will have to unsituate Post 14. I am on leave effective this morning.

— M. Perrin

Admin reply (07:19): Received. Map draft updated. Note: training-archive match is a known false positive when gauges peg; IT said so in 2024. Bus route remains active unless you rescind continue-in-service in writing.

Perrin: no further replies

AI was involved in writing this story.